Operations

Asphalt transport.

Sandfrakt sails with up to 550 tonnes of hot asphalt in the centre hold, insulated with blankets so the asphalt stays warm for 1-2 days.

How it works

550 tonnes of hot asphalt, insulated with blankets.

The vessel Sandfrakt can sail with up to 550 tonnes of hot asphalt in the centre hold. The asphalt is insulated with blankets so that it stays warm for 1-2 days and is ready for laying upon arrival at the destination.